AVL consulting

Church AVL consulting
before the concrete pours.

The most expensive AVL mistakes begin while the room is still on paper. Qohr helps churches define the system, budget, infrastructure, and responsibilities before costly decisions are locked in, and does the same work on rooms that already exist and are not doing what the church needs.

Design coordination

The least expensive place to solve an AVL problem is on paper.

Missing conduit. No structure above the screen. A speaker in a camera sightline. An equipment room without cooling. These are small drawing decisions that become disruptive field changes.

REVIEWDrawingIdentify + revise
COORDINATEMeetingAssign + resolve
REWORKFieldRemove + rebuild

Clarity before commitment.

Start with the decisions the church actually needs to make, across audio, video, lighting, acoustics, and LED walls. The right level of documentation follows the project, not the other way around.

System assessment

A clear review of the room, current equipment, infrastructure, workflows, team capability, and the problems that need to be solved first.

Budget planning

Realistic numbers organized by priority and phase, so leadership can approve a plan instead of reacting to a surprise.

System design

Sanctuary and auditorium AVL design covering audio, video, lighting, acoustics, control, networking, screen locations, infrastructure, and access, all documented as one coordinated system.

Architect coordination

Drawing review, design meetings, RFIs, pathways, power, structure, sightlines, equipment spaces, and trade responsibilities resolved early.

Phased roadmaps

What to address now, what can wait, and what should be roughed in today so a future phase does not require avoidable rework.

Qohr sanctuary AVL and LED wall design visualization for Capo Beach Church
Church construction underway with coordinated AV infrastructureQohr coordination / Infrastructure in the field

Give every trade the same answer.

AVL touches architecture, electrical, structure, acoustics, networking, mechanical systems, and finishes. Consulting keeps those decisions visible and gives the project team a coordinated point of reference.

  1. Discovery

    Room, ministry, team, timeline, constraints, and existing conditions.

  2. Basis of design

    Priorities, performance criteria, system approach, and planning budget.

  3. Drawing coordination

    Locations, pathways, power, structure, sightlines, and equipment rooms.

  4. Bid or proposal review

    Scope comparison, exclusions, substitutions, and questions before award.

  5. Commissioning support

    Verification that the installed system matches the plan and is ready for the team.

A consulting engagement can stop there. When a church wants the same team to carry the plan through design, installation, training, and support, that is a different scope.

See how design and installation continue

Honest guidance

Sometimes the right answer is to move what you own.

Not every problem requires a new system. Existing equipment may be reusable, a room may need treatment before new speakers, or infrastructure may be the smarter first phase. You get our honest read either way.

Choose the right starting point

Meet the project where it is.

You do not need a finished brief. A problem, a drawing set, a budget question, or a construction timeline is enough to begin.

Focused assessment

For a church that needs an experienced second set of eyes on an existing room, a recurring problem, or a proposed upgrade.

Design review

For a team with drawings or proposals already in hand that needs gaps, risks, and coordination issues identified before commitment.

Renovation consulting

For projects where AVL must be coordinated with architecture, electrical, structure, acoustics, and construction sequencing.

New construction planning

For churches that need AVL represented from early programming through documents, procurement, installation, and commissioning.

Completed LED wall and truss system at Abundant Life Church in Happy Valley, OregonHappy Valley, Oregon

Project planning

Abundant Life Church

A custom truss, hoist, and control system specified as one system rather than assembled from parts, with access for future service designed in instead of added later. The structure is resolved so the display can follow.

View the project

Plan the room before the gear.

Useful answers for churches evaluating an upgrade, renovation, or new construction project.

Consulting can include system assessments, needs analysis, budget planning, phased recommendations, system design, drawing review, architect and contractor coordination, infrastructure planning, proposal or bid review, commissioning support, and guidance before equipment decisions are finalized.